Family-owned · Licensed Florida General Contractor · CGC1542311Call (813) 785-1119Text usMon–Fri 8–4:30Se habla español

Home Remodeling

Bathroom Remodeling in Tampa Bay: Waterproofing, Layouts and Planning

Tile isn't waterproof. Here's what goes behind a long-lasting Florida shower, how to choose a layout, and what to plan before your Tampa Bay bathroom remodel starts.

Walk-in shower with blue tile and a tiled niche

A bathroom remodel is judged on day one by how it looks. It is judged in year five by what you can't see: whether the shower was waterproofed correctly, whether it drains properly, and whether the room can handle Florida humidity. This guide covers the decisions that matter most before you start, from layout to the waterproofing behind the tile.

Start with how you use the room

Before picking tile, decide what the new bathroom needs to do. A few questions shape almost every other choice:

  • Tub or shower? Many owners convert a rarely used tub to a larger walk-in shower. If it's the only tub in the house, think about resale and young children before removing it.
  • Who uses it? A primary bath shared by two people may need a double vanity and more storage. A guest bath can stay simpler.
  • Aging in place? A low or curbless shower entry, a bench, grab-bar blocking in the walls, and good lighting are much easier to add now than later.
  • What stays where? Keeping the toilet, shower, and vanity in their current locations is usually the simplest path. Moving plumbing adds cost, time, and often a permit.

Common layout options

Tub-to-shower conversion. The existing tub area becomes a walk-in shower, often with a glass panel or door and a built-in niche. It's one of the most requested updates because it reuses the existing footprint.

Walk-in or curbless shower. Removing the curb creates a clean, open look and an easier entry. It also takes more planning: the floor has to slope to the drain without sending water into the rest of the room, which may mean recessing the subfloor or using a linear drain.

Double vanity. Two sinks need more wall length and separate plumbing connections. If space is tight, one wide sink with extra counter and drawer space can be more practical.

Double vanity and hex tile floor
Double vanity and hex tile floor

Waterproofing: the part you don't see

Tile and grout are not waterproof. Grout is porous, and water that gets behind tile has to go somewhere. In a well-built shower, that water reaches a waterproof layer and drains away instead of soaking into the wall framing or the floor.

What goes behind the tile

Modern showers usually use one of these approaches:

  • Sheet membranes bonded over the backer board, with sealed seams and corners
  • Liquid-applied membranes rolled or troweled on in multiple coats to a specified thickness
  • Traditional mortar beds with a shower pan liner under the floor

Whatever system is used, the products should be installed according to the manufacturer's instructions and as one complete system. Membranes used under tile are commonly tested to the ANSI A118.10 standard. Mixing parts from different systems, skipping the corner pieces, or leaving gaps around the valve and shower head are common causes of hidden leaks.

Slope, drains, niches, and benches

  • Slope: The shower floor has to slope evenly toward the drain, commonly at least a quarter inch per foot. Flat spots leave standing water that eventually finds the grout.
  • Niches and benches: The bottom of a niche and the top of a bench should slope slightly so water runs off. Both need to be waterproofed like the rest of the shower.
  • Flood testing: Many membrane manufacturers recommend plugging the drain and flooding the shower floor before tile goes down, often for 24 hours, to confirm there are no leaks. Ask your contractor whether they test and when.

Backer board, not drywall

Paper-faced drywall doesn't belong inside a shower. Wet areas should use cement board or foam backer boards rated for the waterproofing system being installed.

Built for Florida humidity

Tampa Bay bathrooms deal with moisture even when the shower is off. A few details help the finished room last:

  • Ventilation: An exhaust fan sized for the room and ducted to the outside, not into the attic, removes moisture after every shower. A timer or humidity-sensing switch helps it actually run long enough.
  • Materials: Porcelain tile, quartz or solid-surface counters, and moisture-resistant vanity construction hold up well in humid conditions.
  • Glass: Shower doors and glass panels near a tub or shower must be safety glass. A frameless glass panel also makes a smaller bathroom feel larger.
Primary bath with frameless glass shower
Primary bath with frameless glass shower

Permits

Whether you need a permit depends on the scope and on your city or county, such as the City of Tampa, Pinellas County, or Pasco County. As a general rule, replacing finishes like tile, a vanity, or fixtures in the same location may not require one, while moving plumbing, adding or changing electrical circuits, changing windows, or making structural changes usually does. Your contractor should confirm the requirements with the local building department before work begins.

How a bathroom remodel usually runs

  1. Site visit and scope: Measure the room, confirm the layout, and note what stays and what changes.
  2. Design and selections: Choose tile, fixtures, vanity, and glass. Long-lead items should be ordered before demolition.
  3. Demolition: Remove finishes down to the framing or subfloor, then check for hidden water damage.
  4. Rough-in: Plumbing and electrical changes, plus any inspections that are required.
  5. Waterproofing and backer: Install the board and membrane system, then flood test where applicable.
  6. Tile and finishes: Tile, grout, vanity, countertop, fixtures, paint, and glass.
  7. Final walkthrough: Review every detail and confirm the fan, drains, and fixtures work as intended.

Questions to ask your contractor

  • Which waterproofing system will you use, and is it installed per the manufacturer's instructions?
  • Do you flood test the shower before tile?
  • What happens if you find water damage behind the walls during demolition?
  • Who pulls the permit, and which inspections are required?
  • What is the schedule, and which items need to be ordered before demolition?

CWL Construction builds walk-in showers, tile, vanities, and complete bathroom remodels across Oldsmar and Tampa Bay. Learn more about our bathroom remodeling services, or see recent bathrooms on our projects page.

Frequently asked questions

Is tile waterproof on its own?

No. Tile and especially grout let some water through. A shower stays dry behind the walls because of the waterproofing membrane and the sloped pan underneath the tile.

Can a tub be converted to a walk-in shower?

Usually, yes. A tub-to-shower conversion reuses the existing footprint and plumbing location, which keeps the project simpler. The drain may need to be relocated or resized for the new shower.

Do I need a permit to remodel a bathroom in Tampa Bay?

It depends on the scope and your local jurisdiction. Moving plumbing, changing electrical, or structural work usually requires a permit, while swapping finishes in place may not. Your contractor should confirm with the city or county building department.

How long does a bathroom remodel take?

It depends on the size of the room, how much changes, permit and inspection timing, and when materials arrive. Ordering tile, fixtures, and glass before demolition is one of the best ways to keep the schedule tight.

Related servicesBathroom Remodeling Whole-Home Remodeling

Follow our work

See new projects on Instagram

@craftsman_without_limits_
Home office behind steel-frame glass doorsDouble vanity and hex tile floorFireplace surround and built-in shelvingFeature wall build, in progressWalk-in shower with tiled nicheLiving room remodel

Start your project

Tell us what you're planning.

Send a few photos and a short description. We'll follow up to talk scope, timing, and next steps.